Commissioning
Operating Manual PNOZ ml1p
21575-EN-06
18
6.2
Download modified project to the PNOZmulti system
As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat-
ing instructions for the base unit.
NOTICE
For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.
6.3
Connection
Supply voltage
AC
DC
Connection of two PNOZmulti base units via the module PNOZ ml1p