background image

Two-hand control unit

Up to PL e of EN ISO 13849-1
P2HZ X1.10P

NSG-D-2-324-2009-09

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: pilz.gmbh@pilz.de

-4

Terminal configuration

K

le

m

m

e

n

b

e

le

g

u

n

g

Installation

][Montage_Zweihand

`

The safety relay should be installed 
in a control cabinet with a protec-
tion type of at least IP54.

`

Use the notch on the rear of the unit 
to attach it to a DIN rail. 

`

Ensure the unit is mounted securely 
on a vertical DIN rail (35 mm) by us-
ing a fixing element (e.g. retaining 
bracket or an end angle).

Notice
The distance of the button connected 
to the two-hand relay from the nearest 
danger zone must be large enough 
that if one of the buttons is released, 
the dangerous moment is interrupted 
before the operator can reach into the 
danger zone (see EN 999 “The posi-
tioning of protective equipment in re-
spect of approach speeds of parts of 
the human body”).

Dimensions

Abmessungen

* with spring-loaded terminals

Y30

A2

18

99

4

Y32 Y35

Y31

X4

A2

P4

14

CH.2

X3

P2HZ X1.10P

S11

A1

S12 S13

S21

X2

POWER
CH.1

P4

X1

Y2

Y1

A1

13

P3

23

S22

41 42

34

24

S21

P3

S23

S22 S23

S12

S13

S11

33

45

(1.77")

121  (4.76")

* 101 (3.98")

94 (3.70")

Summary of Contents for P2HZ X1.10P

Page 1: ...chreibung_Zweihand The two hand control relay meets the requirements of EN 574 Type IIIC It forces the operator to keep his hands outside the danger zone area during the hazardous movement The unit is...

Page 2: ...ry contacts 41 42 Out semi RUN Semiconductor out put for operational readiness Y35 Out semi CH Semiconductor out put switch status Y32 t0 Recovery time after power on t1 Simultaneity channel 1 and 2 t...

Page 3: ...ration Betriebsbereitschaft herstellen Supply voltage Input circuit Feedback loop Semiconductor output Key Supply voltage AC DC A1 L1 N A2 A1 L A2 L Input circuit Single channel Dual channel Two hand...

Page 4: ...ely on a vertical DIN rail 35 mm by us ing a fixing element e g retaining bracket or an end angle Notice The distance of the button connected to the two hand relay from the nearest danger zone must be...

Page 5: ...ly voltage Supply voltage UB DC 24 V Voltage tolerance 15 10 Power consumption at UB DC 2 5 W Residual ripple DC 10 Voltage and current at Input circuit DC 24 0 V N O contact 30 mA N C contact 20 mA F...

Page 6: ...ay on de energisation reaction time in accordance with EN 574 N O contact 15 ms N C contact 30 ms Recovery time 250 ms Simultaneity channel 1 and 2 500 ms Supply interruption before de energisation 15...

Page 7: ...rds current on 08 03 apply Bestelldaten Spring loaded terminals Terminal points per connection 2 Order no 787341 Stripping length 8 mm Order no 787341 Dimensions Height 101 0 mm Order no 787341 94 0 m...

Reviews: