Commissioning
Operating Manual PNOZ mmc7p CC
1003066EN02
14
4: SLD (Cable shield)
5: FG/PE (Functional earth)
6.4
Download modified project to the PNOZmulti safety system
As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat
ing instructions for the base unit.
NOTICE
For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.
6.5
Connection example
PNOZ mmc7p CC