First commissioning
Operating Manual PSEN sc L 3/5 series
1005056-EN-01
| 65
9
First commissioning
9.1
Requirements for commissioning
Please note:
}
Ensure that the window of the safety laser scanner is clean, intact and without finger-
prints.
CAUTION!
Detection of safety zones being violated deteriorates
If the safety laser scanner is commissioned in deviating conditions, the de-
tection of the safety zones being violated may deteriorate.
– Ensure that the conditions for commissioning are met.
9.2
System connection
Make sure that the selected evaluation device has the following property:
}
OSSD signals are evaluated through 2 channels with plausibility monitoring
7
5
6
0 V
24 V
0 V
OSSD 1
OSSD 2
24 V
0 V
1
2 24 V
F.E.
8
PSENscan
4 n.c.
3 n.c.
Warning message
External supply voltage
Indicator light unit
Input circuit
Evaluation device
Fig.: Dual-channel connection of the safety laser scanner on the input circuit of an evaluation device
(1 zone set, warning message, automatic restart)