background image

7

REV-01 14, 13

Main Supply Connection

Connect the faucet inlet tubes (Q) to inlet supply lines (R). Connect the 

• 

supply stops (S) to the inlet supply lines (R) (left is hot water supply and 
right is cold water supply). Make sure inlet supply lines (R) are securely 
tighten. Do not over- tighten.
Turn on water. Check for any leaks. Make sure all the connections are 

• 

secure.
Remove aerator (T).

• 

Open the handle.

• 

Flush and allow water to run at full flow for at least one minute.

• 

Replace aerator (T).

• 

                                                                    

Summary of Contents for 3LG160 Series

Page 1: ...0 3LG180B 3LG181 3LG160H This product meets the following standards ASME A112 18 1 ANSI A117 1 ANSI NSF 61 SECTION 9 CUPC IAPMO LISTED ADA COMPLIANT CONTAINS NO MORE THAN 0 25 WEIGHTED AVERAGE LEAD CONTENT REV 01 14 13 Engineering Excellence Pioneer Industries Inc 2012 Engineering Excellence Engineering Excellence ...

Page 2: ... installation Carefully shut off both hot and cold water supplies from under the sink Plug the sink drain with a soft cloth to prevent intrusion of debris or the loss of any faucet parts For replacement installations carefully remove the existing faucet and clean the entire surface of the sink mounting holes Pioneer reserves the right to make changes in the design of faucets without notice as spec...

Page 3: ...f necessary Clean the mounting surface If necessary Insert the faucet through sink hole Thread the mounting bolt B into the faucet from beneath Slide the mounting plate C through the mounting bolt Thread the mounting nut D from underside Secure the faucet to the sink with mounting nut D supplied with the faucet Remove the excess plumbers putty or sealant from the faucet ...

Page 4: ... hole faces back of the fau 3 cet Hold the pop up assembly in place and tighten the locknut G Remove the excess putty Connect the trap H check manufacturer s 4 instructions for installation Remove rod nut I 5 Ensure the washers K is in place for brass pop up only Insert rod J 6 Tighten the rod nut I Push rod down to open drain Insert the pop up stopper E carefully 7 Test if the pop up stopper E is...

Page 5: ...5 REV 01 14 13 Pop up Drain Installation ...

Page 6: ... 2 N Attache the grid trim ring N from top of the drain hole Insert the grid drain assembly O from under the lavatory sink Hold the grid trim ring N in place while threading the locknut P until 3 the locknut is snug with the underneath the lavatory sink Tighten the locknut P 4 Remove the excess putty Connect the trap H check manufacturer s 5 instructions for installation ...

Page 7: ... supply lines R left is hot water supply and right is cold water supply Make sure inlet supply lines R are securely tighten Do not over tighten Turn on water Check for any leaks Make sure all the connections are secure Remove aerator T Open the handle Flush and allow water to run at full flow for at least one minute Replace aerator T ...

Page 8: ...tton W located on the top of the handle and loosening Phillips screw Unscrew retainer sleeve X and retaining nut Y Use two fingers to raise the red adjustment ring Z Turn adjustment ring Z counterclockwise to decrease the tempera ture setting and clockwise to increase the temperature Replace the adjustment ring Z Reassemble and test until desired safe temperature is reached Note Ensure proper alig...

Page 9: ...9 REV 01 14 13 3325 S Garfield Ave Commerce CA 90040 Telephone 800 338 9468 323 888 8873 Fax 323 888 9515 Hours M F 7 30am to 5 00pm PST www pioneerind com Engineering Excellence Engineering Excellence ...

Reviews: