CX-683
-
Removing the Carriage Motor (2/2)
1. Remove the screw, then remove the Holder.
2. Remove the screw, remove the flat spring situated in
the position indicated by the black arrow head, then
drive out the Carriage Motor through the direction
indicated by the white arrow head.
-
Removing the Spindle Motor (2/2)
1. Peel off solder provided in the circled position, then
remove the lead wire.
2. Remove the three screws, then drive out the Spindle
Motor through the direction indicated by the white
arrow head.
Note: When the PU Unit is installed, it must be
moved along the outer perimeter.
-
Removing the Loading Motor (2/2)
1. Peel off solder in the circled position, then remove
the Flexible PCB.
2. Remove the four screws, then dismount
the Bracket.
3. Remove the two screws, then dismount
the Motor Bracket.
4. Remove the two screws, then dismount
the Loading Motor.
When replacement of the Loading Motor is
complete, apply 7V to the new Loading
Motor with the chassis being assembled
(without the MD Unit, though). Then, insert
the disk and clamp.
-
Why clamping is required
It is difficult to dismount the Chassis Assy
from the Upper Case because its move can
be blocked by section A in the figure. As
long as the machine is in the clamp mode,
section A is pulled inside the chassis,
thereby allowing you to remove the chassis
easier.