16
INSTALLATION AND ASSEMBLY
(1) Weight-tolerant
The ground must be flat and horizontal. It should be able to bear the weight of the system.
For wooden floors, if the part receiving the weight of the system lies at the center between the reinforcement
beams below the floor, the floor may become deformed or may curve inwards. In such cases, lay a more than 12
mm thick board below the system to distribute the weight of the system on the floor.
For concrete floors, it may not be possible to install the system horizontally due to the roughness of the floor. In
such cases, do the same as above.
After installation, adjust and secure with the floor leveler.
(2) Height to ceiling
¶
Leave about 30 cm between the top of the system and ceiling. Take note that if there are air-conditioner vents
or lights at the top, problems caused by dusts, temperature, humidity, and water drop may result. If adequate
space cannot be provided on the left and right sides, and at the back of the system, and the system is be
installed directly onto the wall, heat can only be discharged from the top. In such cases, be sure to provide
vents for discharging heat. Also observe the temperature and humidity conditions in (7).
(3) Front Space
¶
Finger and hand prints form easily on the face of the screen. Therefore make sure viewers cannot touch it
directly.
Leave workspace in front for replacing the screen.
(4) Rear Space
¶
At least 5 cm of space is required at the back of the system. However, leave more than 1 m at the back as
working space for the maintenance of the MPJ and MVP.
(5) Installation work for securing system
¶
After installation, always lower the floor levelers to prevent the system from turning over.
This system is also provided with holes to hook wires for preventing it from turning over. To prevent the
system from turning over, it is recommended that it be secured to the floor or wall.
¶
The method of securing to floors and walls differ according to their materials. Always have a construction
specialist or Pioneer dealer perform the procedure for you.
1. INSTALLATION CONDITIONS
Floor leveler
CHAPTER 3.
INSTALLATION AND ASSEMBLY
Summary of Contents for RM-V1000NU
Page 4: ......
Page 8: ......
Page 9: ......
Page 11: ......
Page 12: ......
Page 35: ......
Page 37: ......
Page 39: ......
Page 42: ......
Page 47: ......
Page 49: ...48 ADJUSTMENTS ...
Page 50: ...49 ADJUSTMENTS ...
Page 52: ...51 ADJUSTMENTS Movement on screen Displayed OSD ...
Page 53: ...52 ADJUSTMENTS ...
Page 54: ...53 ADJUSTMENTS ...
Page 55: ...54 ADJUSTMENTS ...
Page 56: ...55 ADJUSTMENTS ...
Page 58: ......
Page 59: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 94: ......
Page 99: ......
Page 100: ......
Page 102: ......
Page 107: ......
Page 133: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......