29
PD-D9MK2-K
5
6
7
8
5
6
7
8
A
B
C
D
E
F
8
Grounding wire
LOADER ASSY
LOADER ASSY
Chassis
11
Grounding wire
Mecha Cover 989
2
×
3
1
7
7
×
2
5
×
4
Mecha Angle
DVDM ASSY
2
1
Remove the screw which secure Grounding wire in place.
6
Remove the Mecha Angle.
9
Extend the Grounding wire which were removed in
procedures
1
and connect them to Chassis for grounding.
11
Raise the LOADER ASSY.
10
Connect a extension jig cable between DVDM ASSY (CN953)
and AJKB ASSY (CN1402).
Remove the three screws.
2
Remove the Mecha Cover 989.
3
4
Disconnect the one flexible cable.
Remove the four screws.
5
8
Slightly lift the LOADER ASSY and displace it slightly
backward.
Remove the four screws.
7
Diagnosis
Note:
Service cable 5P (GGD1425) is required when
diagnosing the DVDM ASSY side B.
3
17P FFC
extension jig cable
(GGF1157)
10
CN953
CN1402
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299