1. In case of the Pulley Motor installation, check if the
value of the Fig. 3-B is correct.
2. When installing the wire of the LOADING MOTOR PCB
Assy, install it correctly as Fig. 3-C.
Manual soldering conditions
• Soldering temperature: 320
±
20 °C
• Soldering time: Within 3 seconds
• Soldering combination: Sn - 3.0 Ag - 0.5 Cu
3. When installing the LOADING MOTOR PCB Assy, install
itcorrectly as Fig. 3-D.
4. In case of the LOADING MOTOR PCB Assy installation,
hook the wire on the LOADER SUB Assy as shown Fig.
3-E.
4: RACK LOADING / MAIN GEAR / PULLEY GEAR
(Refer to Fig. 4-A)
1. Unlock the support
2
and remove the Gear Pulley.
2. Remove the Gear Main.
3. Press down the catcher
1
and slide the Rack Loading.
NOTE
1. In case of the Rack Loading installation, hook the Rack
Loading on the LOADER SUB Assy as shown Fig. 4-B.
2. When installing the Gear Main, take care the direction
of up or down as shown Fig. 4-C.
5: CLAMPER ASSY (Refer to Fig. 5-A)
1. Press the Clamper and rotate the Plate Clamper
clockwise, then unlock the 3 supports
1
.
2. Remove the Plate Clamper, Magnet Clamper and
Clamper.
BROWN (1)
WHITE (2)
Fig. 3-B
7.0
±
0.1 mm
Safety surface for pressing
of the insert.
Loading Motor
Pulley Motor
Check Hook
LOADING MOTOR PCB Assy
LOADING MOTOR PCB Assy
Fig. 3-C
Fig. 3-E
Check Hook
Fig. 3-D
Rack Loading
B
A
The Lever should be position
between A and B.
Check Hook
Rack Loading
LOADING SUB Assy
Gear Main
Gear Pulley
Fig. 4-A
Fig. 4-B
Rack Loading
Check Hook
Fig. 4-C
Main Gear
Up Side
Down Side
Plate Clamper
Magnet Clamper
Fig. 5-A
Main Frame
Clamper
LOADER SUB Assy (Bottom Side)
1
1
1
1
2