2.2. Floor Condition
Piranha requires a concrete floor, in good condition, level to /-
0.500”
(12.7mm).
2.3. Electrical Services
The electrical supply to the machine and the plasma arc cutting system must
be stable, with no spikes or electrical noise (interference) from other
machinery.
2.3.1.
CNC Control
•
A dedicated 230V / 30A single phase service is required for the
CNC control.
2.3.2.
Plasma System
•
Refer to the specific plasma system manual for available voltages.
•
Use a separate, wall mounted, fused, quick disconnect electrical
box in a convenient location near the machine for the plasma
system.
2.3.3.
Earth Ground
The machine foundation area must have an adequate ground rod to reduce
electrical noise problems. Excess electrical noise will interfere with
automated control functions and plasma arc cutting performance. Proper
grounding is essential for reasons of personal safety and machine operation.
NOTE:
Installation must be inspected by a qualified electrician and meet
state and local regulations
•
Use 5/8" (16.0 mm) copper rod, 8 ft. long (2.5 m) minimum or per
State requirements.
•
Install the primary ground rod next to the main electric enclosure
(within 8 feet or 2.5 meters of the plasma table).
Summary of Contents for CNC Plasma Cutting Table
Page 2: ......
Page 4: ...TABLE OF CONTENTS Sept 2018 4...
Page 22: ...SAFETY Sept 2018 22...
Page 24: ...INSTALLATION Sept 2018 24...
Page 88: ...PROGRAMMING Sept 2018 88...
Page 117: ...PIPE CUTTING ATTACHMENT Sept 2018 117 Pipe Supports Pipe Cutter Base...
Page 124: ...PIPE CUTTING ATTACHMENT Sept 2018 124...
Page 128: ...PIPE CUTTING ATTACHMENT Sept 2018 128 j Then press F2 SYSTEM to see the following...
Page 136: ...PIPE CUTTING ATTACHMENT Sept 2018 136...
Page 140: ...WATER MIST CHILLER Sept 2018 140...
Page 144: ...APPENDIX A FastCAM SETUP Sept 2018 144 4 Choose the functions you need and Enter...
Page 154: ...APPENDIX A FastCAM SETUP Sept 2018 154...
Page 159: ...APPENDIX A FastCAM SETUP Sept 2018 159...
Page 164: ...APPENDIX A FastCAM SETUP Sept 2018 164...
Page 170: ...APPENDIX B Parametric Shape Library Sept 2018 170 9 Fla X 10 Lad 11 Rec 12 Rec8...
Page 172: ...APPENDIX B Parametric Shape Library Sept 2018 172 19 Rec 20 Rec c 21 Circle4 22 Rec...
Page 174: ...APPENDIX B Parametric Shape Library Sept 2018 174...