SAFETY
Sept-2018
6
MAINTENANCE PERSONNEL
Only qualified personnel should make repairs on this equipment. Use caution and
follow Piranha procedures when working on the machine. Be sure to observe the
following guidelines:
1. Before performing maintenance or repair, turn the power OFF and follow lock
out/tag out (zero energy shutdown) procedures. Also, follow any lock out/tag out
procedures applicable to your specific plant requirements.
2. Wear safety glasses and other personal protective equipment as required by
applicable federal, local industry, and plant safety program standards.
3. Wear proper clothing. Do not wear watches, rings, jewelry, or loose-fitting
clothes.
4. Read and review the manual carefully.
5. Be familiar with the operation of the machine.
6. Practice preventative maintenance. Inspect the equipment regularly and repair
or replace worn components and tooling. Read the vendor components manuals
for any additional preventative maintenance.
7. Always replace safety guards and other safety devices removed for service and
make sure that they are fully functional before operating the equipment.
8. Never remove, jumper out or bypass a safety device to permit machine
production.
9. Never place yourself in a hazardous situation to observe a problem and ask
someone else to operate the machine. This could be a very dangerous and life-
threatening situation.
Summary of Contents for CNC Plasma Cutting Table
Page 2: ......
Page 4: ...TABLE OF CONTENTS Sept 2018 4...
Page 22: ...SAFETY Sept 2018 22...
Page 24: ...INSTALLATION Sept 2018 24...
Page 88: ...PROGRAMMING Sept 2018 88...
Page 117: ...PIPE CUTTING ATTACHMENT Sept 2018 117 Pipe Supports Pipe Cutter Base...
Page 124: ...PIPE CUTTING ATTACHMENT Sept 2018 124...
Page 128: ...PIPE CUTTING ATTACHMENT Sept 2018 128 j Then press F2 SYSTEM to see the following...
Page 136: ...PIPE CUTTING ATTACHMENT Sept 2018 136...
Page 140: ...WATER MIST CHILLER Sept 2018 140...
Page 144: ...APPENDIX A FastCAM SETUP Sept 2018 144 4 Choose the functions you need and Enter...
Page 154: ...APPENDIX A FastCAM SETUP Sept 2018 154...
Page 159: ...APPENDIX A FastCAM SETUP Sept 2018 159...
Page 164: ...APPENDIX A FastCAM SETUP Sept 2018 164...
Page 170: ...APPENDIX B Parametric Shape Library Sept 2018 170 9 Fla X 10 Lad 11 Rec 12 Rec8...
Page 172: ...APPENDIX B Parametric Shape Library Sept 2018 172 19 Rec 20 Rec c 21 Circle4 22 Rec...
Page 174: ...APPENDIX B Parametric Shape Library Sept 2018 174...