No Diving or Jumping. Observe all Safety Rules
2-3
GENERAL INSTRUCTIONS - BRACELESS OVAL POOLS
ASSEMBLING THE POOL BASE
Section
2
A. CONT. INSTALLATION OF BOTTOM PLATES AND BOTTOM RAILS
3. Patio Stones (Optional)
a. Concrete patio stones may be placed at the base
of each upright of your pool.
(Image 4)
b. Each bottom plate will show the location for a patio
stone. Make a mark in the ground at each base
plate.
c. Remove the bottom rails and bottom plates and lay
out the patio stones around the circle where the
bottom plates were.
d. The patio stones must be sunk into the ground so
the tops are flush with the soil around them.
Use
the carpenter’s level to make sure the patio stones
are perfectly level and flush with the ground.
Use
either the carpenter’s level and a 2-by-4 (5cm x
10cm) wood plank, or the optical level between
patio stones to make sure the stones are level with
each other.
(Image 5)
e. Do not install blocks or rails on loose sifted soil or
sand. There must be no space between the ground
and the bottom of the rails. All patio blocks must
be flush with the ground, solid and level with each
other in all directions.
NOTE:
Installing patio blocks is optional and the blocks
may shift due to temperature changes.
Contact your Dealer:
Please contact your dealer for more information about
using patio stones.
Contact your Dealer:
Please contact your dealer for more information about
using patio stones.
Important Note:
Make sure the patio stones are perfectly level and flush with the
ground. All patio blocks must be flush with the ground, solid and
level with each other in all directions.
4
5