No Diving or Jumping. Observe all Safety Rules
Section
4
GENERAL INSTRUCTIONS - ROUND POOLS
ASSEMBLING THE POOL FRAME
A. CONT. INSTALLING THE TOP LEDGES AND UPRIGHTS
3. Install the top ledges
a. Place a top ledge (key 7) with one end on top of the top
plate. The side of the top ledge facing the centre of the
pool should be close to the pool liner and pool wall. The
side of the top ledge facing the outside of the pool will
form a large overhang.
(Image 3)
b. Line up the holes as shown. Fasten through the
two oval holes into the holes marked ‘A‘ in the top plate
below with two self-tapping screws (key 8-Image 3). Do
not tighten the screws yet. Leave the screws slightly
loose until all the top ledges are in place.
c. Repeat the last two steps for the other end of the
top ledge.
d. Repeat steps (a) to (c) to install the rest of the top ledges
around the top of the pool wall.
e. Make the pool settle into a perfect circle by pushing the
top of the pool wall vigorously inward at each upright
(this will help make the bottom of the pool wall shift into a
perfect circle).
(Image 4)
f. Adjust all the top ledges to line up evenly with each other
and tighten all the screws.
B
A
B A
3
4-3
7
8
B
A
B A
PUSH
VIGOROUSLY
4
Important Note:
Make sure to refer to your parts listing for the measurements
of the top ledges. This will help you to determine which top
ledge to use for each pool section.