5. Tie the opposite end of
the cord to the bucket
handle. Carefully place
the bridge or tower
across two chairs or
tables of the same height
as shown in Figures 1 and
2. Make sure the bucket
is hanging straight down
from the center of the
structure.
6. Add sand to the bucket.
If conducting a pass/fail
test, pre-measure the
sand before adding it to
the bucket. If conducting
a destructive test, contin-
ue to gradually add sand
until the structure breaks,
then measure the weight
of the sand.
Alternative for Towers
1. Place the bucket on top of the tower (Figure 3).
2. Add sand to the bucket.
Note: If conducting a pass/fail test, add the sand, place the lid on the bucket, and
then place the bucket on the tower. This will reduce the chance of a mess.
Warranty
Pitsco provides a one-year limited warranty against defects in manufacturing on all items pur-
chased. In a warranty situation, Pitsco will arrange for the return of defective items for evalu-
ation. Qualified Pitsco staff will determine warranty coverage and notify the customer. Items
under warranty will be repaired or replaced at Pitsco’s discretion. Customers will be billed for all
costs associated with non-warranty items.
Figure 2
Figure 3
P.O. Box 1708 • Pittsburg, KS 66762
www.pitsco.com
Toll-Free Orders 800-835-0686
18938 V0211
Figure 1