background image

5. Tie the opposite end of 

the cord to the bucket 

handle. Carefully place 

the bridge or tower 

across two chairs or 

tables of the same height 

as shown in Figures 1 and 

2. Make sure the bucket 

is hanging straight down 

from the center of the 

structure.

6. Add sand to the bucket. 

If conducting a pass/fail 

test, pre-measure the 

sand before adding it to 

the bucket. If conducting 

a destructive test, contin-

ue to gradually add sand 

until the structure breaks, 

then measure the weight 
of the sand. 

Alternative for Towers

1. Place the bucket on top of the tower (Figure 3).

2. Add sand to the bucket.

Note: If conducting a pass/fail test, add the sand, place the lid on the bucket, and 
then place the bucket on the tower. This will reduce the chance of a mess.

Warranty

Pitsco provides a one-year limited warranty against defects in manufacturing on all items pur-

chased. In a warranty situation, Pitsco will arrange for the return of defective items for evalu-

ation. Qualified Pitsco staff will determine warranty coverage and notify the customer. Items 

under warranty will be repaired or replaced at Pitsco’s discretion. Customers will be billed for all 

costs associated with non-warranty items.

Figure 2

Figure 3

P.O. Box 1708 • Pittsburg, KS 66762

www.pitsco.com

Toll-Free Orders 800-835-0686

18938 V0211

Figure 1

Reviews: