In-slab – Mixing kit / Pipe / Manifold 

 

Mixing Kit (reference 2) 

All In-Slab designs should incorporate a BCU 

Mixing kit to be fitted with “Hemp & Paste” 
Thermostat fitted on the mixing kit is recommended at maximum to be set at 50

°

This should be fitted after the secondary pump in the field yet as close as possible to the 
manifold servicing the In-Slab. 
 

Pipe 
The pipe used for the In-Slab circuit is recommended to be 16mm oxygen barrier pipe 
work. 
No more than 100m of pipe per circuit is recommended. 

This is broken down to a maximum of 50m on the flow and 50m return lines. 
No joins or bends to be fitted at any point in the circuit. 
This can be installed either tied to the mesh or to the insulated panel (Depending on the 

set up, 

refer to manufactures specification) 

 
 

 
 

 

Summary of Contents for Hydronic

Page 1: ...Pivot Stove Hydronic Installation Guide...

Page 2: ...ves that will isolate or restrict the flow to be installed Minimum 1 copper to be used between the header tank and appliance Flow Line going into the header tank is to be submerged below the water lin...

Page 3: ......

Page 4: ......

Page 5: ...house 5 Overflow vent pipe to be drained off the roof externally in copper 6 Field pump thermostat to activate on at 65 degrees 7 Field pump to be 8 Field pump to be installed above BCU and electrical...

Page 6: ...oiler to be activated see page 5 Re circulation pump to be wired directly to gasogen to be activated see page 6 Buffer Tank 400ltr 7 Immersion thermostat to activate field pump on at 70 degrees 8 Seco...

Page 7: ...off on the flow line above the location of the sensor tee and BCU yet below the swing check valve Pump is to be fitted with isolation ball valve unions to allow the pump to be isolated for servicing a...

Page 8: ...thermostat s One thermostat to trigger the pump to turn ON at 15 C The other thermostat to turn the pump OFF at 55 C allowing a consistent circulation between the appliance and the BCU BCU is to be fi...

Page 9: ......

Page 10: ...the left hand side on the constant setting as indicated 3A Siemens thermostat to activate the BCU to come on at 20 degrees this is wired into terminal 3 and 1 3B Siemens thermostat to be wired to tur...

Page 11: ...de on the constant setting as indicated 3 Siemens thermostat to be wired to turn the pump of one to temperatures reach 55o This is wired to terminal 2 2 4 Sensor Tee s one to be installed below the BC...

Page 12: ...LHS and is fully open to the desired temperature Optional Thermostatic heads are to be fitted on the LHS in replacement for the cap on the valve Manifold Pipe Between the appliance and the manifold t...

Page 13: ...eld yet as close as possible to the manifold servicing the In Slab Pipe The pipe used for the In Slab circuit is recommended to be 16mm oxygen barrier pipe work No more than 100m of pipe per circuit i...

Page 14: ...CU or pump tee off This will reduce back flow 3 Domestic cold water inlet to lead coil 4 Domestic hot water lead to house 5 6 Both pumps are to be activated at the same temerature 6 Field pump thermos...

Page 15: ...er is evident then lock off and begin the next line Use a bowl or cup to catch any water that bubbles out this water may be black in colour and could stain any surface contacted As soon as air bubbles...

Reviews: