59
7.3 Event Scheduling
The scheduling function enables to set up scheduled events including power on /
power off. It helps the projector become "self-managed".
• You can schedule the following types of events: Power, Input Source,
My Image, Messenger, Slideshow. (
&
28
)
• The power on event has the lowest priority among the all events that are
defined simultaneously.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (
&
27
)
• The priority for scheduled events is as follows 1) specific date 2) weekly 3)
daily.
• Up to five specific dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., ‘Specific date No. 1’ has priority over ‘Specific
date No. 2’ and so on.
• Be sure to set the date and time before enabling scheduled events. (
&
30
)
Once you turn off the projector in the SAVING mode (
&
SETUP menu
in the
Operating Guide
) or the AC power, the current date and time setting is reset.
set.
NOTE
7. Other Functions