Clean Pole Installation and User’s Guide (OM720-02) 11
Step 3. Position upper clamps.
rubber feet
Loosen the set screws of the lower channel clamp and then position the lower channel clamp
12” above the floor. Temporarily tighten the set screws. Position the (PS) power supply
bracket on the pole. Be sure to align the two holes on the mounting bracket with the holes on
the channel clamp. Ensure that the two rubber feet rest securely atop the legs of the cart.
Adjust the channel clamp if need be, and then tighten securely. Attach the PS bracket now.
Step 4. Position power supply.
Place the PS-2 supply atop the previously mounted PS-2 bracket. Positioned properly, two
pins will project from the bottom of the PS-2 supply through the PS-2 bracket. Attach the PS-
2 supply with two screws. Connect the power cable to the bottom of the PS-2 supply. Route
the cable upwards along the piston housing.
Disassembly Process
Disassembly is accomplished by reversing the assembly sequence.