WARNING
Take care to remove any dust during the drilling and make sure not to damage any existing cabling
5.4.0 Remove cover from the wall mount (ref Fig 2)
1
, feed mains cable through the larger bottom hole
2
, place correct
wall mount into position and attach to wall using appropriate fixture devices
3
5.5.0 Electrical Connections
5.5.1 Connect mains cable to appropriate locations on terminal block (ref Fig 2)
4
5.5.2 Connect the Earth (yellow/Green) cable to the Earth Lug (ref Fig 2)
5
WARNING
Replace cover ensuring the cables do not get caught/pinched and attach with the screws located at the bottom and top
6
(ref Fig 3)
5.5.3 Remove dome nut
7
top cover
8
end cap
9
(ref Fig 3)
5.5.4 Slide (push) cable from the light head through tube and out the top
10
, attach swivel with bolt and dome nut and
tighten
11
.(ref Fig 3) When attaching the swivel to the bottom spigot ensure the spigot does not slide up into the tube
5.5.5 Feed cable through grommet
12
and slide into position, trim cable to suitable length
13
5.5.6 Attach to the appropriate locations on the terminal block.
14
(ref Fig 4)
5.5.7 Replace end cap
15
and cover
16
and screw nut
17
down to lock cover in position. (ref Fig 4)
6.0 FINAL INSPECTION, PLEASE ENSURE
6.1.0 The mount is firm and has no movement, and is level (ref Fig1)
6.2.0 The light head moves through its full range of movements
6.3.0 The assembly of light and mount is clean and free of any marks
6.4.0 Energise circuit and test the light fixture for normal operation, that is the green led on the power supply cover is
working
18
and the switch on the light head is working (ref Fig 10)
- NEGA TIVE
BL ACK
+ POSITIVE
RED
6
11
14
15
16
18
17
11
6
6
7
8
13
9
10
12
10
Fig: 3
Fig: 4