1
4.3 Physical Installation
1. Cut a 218~220mm diameter hole on false ceiling (according to speed dome
outer cover). The ceiling needs to embed the 115mm depth speed dome IP cam
body.
2. Take away the 3pcs leaf springs inside the accessory box. Attach the springs
onto the outer cover. According to thickness of ceiling to adjust the location of
springs. Find springs directions as following photo:
3. Push this outer cover into the ceiling. Check if the leaf springs are clipped to
ceiling tightly.