IV. Assembly advices before ini Operation
1. Before installing the trolley, the wheel span needs to be set to that of the beam flange.
2. Ensure that the hanger plate is central to the two sideplates by fitting spacer washers
accordingly.
3. When a clearance of 1-1.5 mm has been achieved between the wheels and the flange,
the trolley can be installed on the beam and the nuts fastened and secured by the split
pin.
4. Ensure that endstops are fitted to the runway, so that the trolley cannot run off.
5. Before applying a load to the trolley, make a test-run to be sure it runs smoothly back
and forth along the entire runway.
6. The hoist may now be hooked on and the combination put into operation.
V. Maintenance and inspection
The trolley is maintenance free.
CE - Declaration of Conformity
We, PLANETA-Hebetechnik GmbH hereby declare under our
sole responsibility that the product:
PLANETA – Gear (GTM) & PLANETA – Push (PTM) travel
trolleys
in serial production correspond with the following rules of directive:
Dipl.-I
Ök
.
Christian
P. Klawitter, PLANETA
General Manger
EC-machine dirctive
2006
/
42
/EC