Plasson Poultry Division, 105 Ilan St. P.O.B. 108 North Industrial Estate Or - Akiva 30600, Israel
Tel: +972-73-2413001 Fax: +972-73-2413221 E-mail: poultry@plasson.co.il www.plassonpoultry.com
03/11 - 6804
N i p p l e D r i n k e r S y s t e m I n s t a l l a t i o n M a n u a l
25.1
25
24.1
24
26
27
28
30
29
Install a suspension and winching system above the
chosen location of the line. Make sure all pulleys are
properly aligned at intervals not exceeding 3.0m (10')
and that the first pulley is located directly above the
beginning of the first section
• Filter must be installed before line header kit.
• If water is supplied from a header tank, the hight of
the header tank bottom must be at least 3 m (10')
above floor level.
• If water is supplied from a main pipe line, In-coming
pressure to header kit should be 1.5 bar (22 psi), max. 2
bar (30 psi).
• Lines must be level. Maximum permitted drop of line
without slope regulator: 15 cm (6").
• If there is a slope, the water inlets (line head kit) must
always be on the upper side.
• Maximum length of line: 120 m (400').
Some restrictions may apply in breeder, pullets and
turkey houses. See individual instructions.
• When using a shocker wire, install 4 suspension clips
per section.
• Lines should be parallel to the floor.
• Cord adjuster should be positioned near the aluminium
profile so that between flocks, the system can be raised
as close as possible to the ceiling.
• Before operating the system, the system must be
flushed thoroughly with high pressure.
General instructions
After the entire line has been
assembled, make sure it is properly
aligned, without distortions. Then
tighten up all the nuts on the
connecting pieces.
23
23.1
Global Presence - Local Commitment