RR 14 EVO 2-400 HYBRID
2.5.2. PRODUCTION PAUSE
I
Caution
The machine must be parked exclusively in the
depot it belongs to.
In the case the general conditions of the
machine must be:
‒
Overhead part of the closed machine (See
“Closure”).
‒
Engine switched off by the
(SA70)
or
(SA71)
switch.
‒
Emergency pushbutton pressed.
‒
Hatches and panels equipped with locked locks.
‒
Keys removed.
‒
The operator can now temporarily leave the
machine unmanned.
‒
The work zone must be delimited and marked.
|
Note
If the operator remains in the area, it is not
essential to lock doors and panels equipped
with locks.
I
Caution
On railways it is prohibited to leave the
machine off completely with lights off.
GRUPPO
2.5.3. PROLONGED SHUTDOWN
When the machine must remain inactive for a
period exceeding
3
days (e.g.: forced absence
of the operator in charge of running and
surveillance of the machine, closure for
holidays, etc).
In the case the general conditions of the
machine must be:
‒
Overhead part of the closed machine (See
“Closure”).
‒
Engine switched off by the
(SA70)
or
(SA71)
switch.
‒
Hatches and panels equipped with locked locks.
‒
Keys removed.
‒
Emergency pushbutton pressed.
‒
Disable the engine by rotating the key in the
battery disconnector to off.
‒
Machine cleaned and disconnected from all
energy supplies.
‒
If the maintenance schedule so requires, all the
necessary maintenance work must be
performed.
GRUPPO
English
29/150
Summary of Contents for RR 14 EVO 2-400 Hybrid
Page 2: ......
Page 4: ...4 150...
Page 16: ...RR 14 EVO 2 400 HYBRID 2 2 2 MAIN SAFETY SIGNALS BRANO English 16 150...
Page 19: ...RR 14 EVO 2 400 HYBRID 2 2 3 INFORMATION SIGNALS BRANO English 19 150...
Page 22: ...RR 14 EVO 2 400 HYBRID 2 2 4 MULTILINGUAL SAFETY SIGNALS BRANO English 22 150...
Page 23: ...RR 14 EVO 2 400 HYBRID BRANO BRANO Indicates caution during handling BRANO English 23 150...
Page 27: ...RR 14 EVO 2 400 HYBRID 26 Main engine unit 27 Auxiliary engine unit GRUPPO English 27 150...
Page 34: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 34 150...
Page 69: ...RR 14 EVO 2 400 HYBRID BRANO English 69 150...
Page 70: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 70 150...
Page 148: ...RR 14 EVO 2 400 HYBRID 14 ENCLOSED DOCUMENTATION 14 1 HYDRAULIC SYSTEM GRUPPO English 148 150...
Page 149: ...RR 14 EVO 2 400 HYBRID 14 2 ELECTRICAL SYSTEM GRUPPO English 149 150...