RR 14 EVO 2-400 HYBRID
9. USE
9.1. FOREWORD
The sequence of main operations necessary to make the machine operational is as follows:
‒
travelling on rubber tyres.
‒
travelling on railway wheels.
‒
Aerial part movement.
There follow the instructions for safe configuration and use of the machine.
|
Note
The sequence of operations necessary to install the machine is affected above all by the operational
situations.
According to the working conditions, the operator should adopt the safest and most suitable operational
sequence.
9.2. START/STOP ENGINE
The engine start and stop actions are possible from the control board on the ground and from the control
board in the basket.
I
Caution
In the case of motors equipped with a particulate device, do not turn the motor off during the regeneration
operation.
9.2.1. MAIN ENGINE START
‒
Move to “Ground control panel”.
‒
Move the switch
(SA37)
to “ground position” or
“basket position” according to the machine’s
operating situation.
‒
Turn the selector
(SA71)
or
(SA70)
to the right
to switch the main engine on.
GRUPPO
English
81/150
Summary of Contents for RR 14 EVO 2-400 Hybrid
Page 2: ......
Page 4: ...4 150...
Page 16: ...RR 14 EVO 2 400 HYBRID 2 2 2 MAIN SAFETY SIGNALS BRANO English 16 150...
Page 19: ...RR 14 EVO 2 400 HYBRID 2 2 3 INFORMATION SIGNALS BRANO English 19 150...
Page 22: ...RR 14 EVO 2 400 HYBRID 2 2 4 MULTILINGUAL SAFETY SIGNALS BRANO English 22 150...
Page 23: ...RR 14 EVO 2 400 HYBRID BRANO BRANO Indicates caution during handling BRANO English 23 150...
Page 27: ...RR 14 EVO 2 400 HYBRID 26 Main engine unit 27 Auxiliary engine unit GRUPPO English 27 150...
Page 34: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 34 150...
Page 69: ...RR 14 EVO 2 400 HYBRID BRANO English 69 150...
Page 70: ...RR 14 EVO 2 400 HYBRID BRANO BRANO English 70 150...
Page 148: ...RR 14 EVO 2 400 HYBRID 14 ENCLOSED DOCUMENTATION 14 1 HYDRAULIC SYSTEM GRUPPO English 148 150...
Page 149: ...RR 14 EVO 2 400 HYBRID 14 2 ELECTRICAL SYSTEM GRUPPO English 149 150...