PLAN OF INSTALLATION
Plan of Installation (continued):
Drill for a 1/2" x 3-1/2"
Red Head Anchor
(4) Places
23-1/4"
30"
7-5/8"
2-7/16"
10"
3-1/4"
6" Minimum
20"
Center of Output Shaft
Gate Operator
Concrete Pad
Gate Operator
Concrete Pad
Operator
Cover
Grade Level
(See Note 2 below)
Operator
Chassis
Secondary Extension
Dimension D
(see Fig. A)
Dimension E
(see Fig. A)
Primary Extension
Pivot Bracket
Arm Assembly
Concrete Pad
Platinum Access Systems can supply an Elbow Arm
Secondary Extension (Part # PA-EA100) to make the unit
backdrivable. Contact Platinum Access for availability.
(Platinum Part # PA-EA100)
1. Follow the local building code to determine the requirement of the concrete pad.
2. We recommend the Pad measurements should be at least 28” long, 20” wide,
and 24” deep to ensure the stable operation of the operator, and a minimum
of 4” above level grade to avoid any flooding of the operator.
3. To support the weight of the gate, we recommend the path of the track should be
at least 10” wide and 6” deep.
BLSW1016 Manual_Layout 1 5/8/2015 5:06 PM Page 15
Drill for a 1/2" x 3-1/2"
Red Head Anchor
(4) Places
24"
30"
12"
5-1/8"
14-1/2"
10-1/4"
6" Minimum
24"
Center of Output Shaft
Gate Operator
Concrete Pad
Gate Operator
Concrete Pad
Operator
Cover
Grade Level
(See Note 2 below)
Operator
Chassis
1. Follow the local building code to determine the requirement of the concrete pad.
2. We recommend the Pad measurements should be at least 24” long, 24” wide,
and 24” deep to ensure the stable operation of the operator, and a minimum
of 4” above level grade to avoid any flooding of the operator.
3. To support the weight of the gate, we recommend the path of the track should be
at least 10” wide and 6” deep.