background image

UCTION MANUAL

 

 

Page 7 

6  MAINTENANCE 

  Keep the unit clean and dry when not in use. Ensure that all equipment is drained when not 

in use. 

 

  Carry out routine visual checks only. 

 

  The orifice in the flow controller attached to the 2L DAF Jar is very small. If any foreign 

bodies have been introduced into the saturator during filling they may become lodged in the 
flow controller. To clean the orifice, remove the elbow from the flow controller on the 2L 
DAF Jar and flush with clean water using a syringe. Ensure the foreign body has been 
removed prior to reassembly.

 

7  SUPPLEMENTARY JAR TESTING PARAMETERS 

The operating parameters tested during a DAF Jar Tester should be recorded for future 
comparison and to optimise full scale plant operating conditions. Below are some suggested 
parameters to supplement existing jar testing records 
 

  Saturator pressure 

  Volume of air saturated water transferred 

  Recycle rate % 

  Qualitative assessment of dispersion in jar 

  Qualitative assessment of floated floc particles 

  Subnatant turbidity 

  Subnatant pH 

  Subnatant colour 

  Subnatant aluminium residual 

  Oxidation of soluble metals 

  Algae removal effectiveness 

 

 

Summary of Contents for DAF Jar Tester

Page 1: ...UCTION MANUAL Platypus DAF Jar Tester ...

Page 2: ...nents 2 4 Operating Instructions 3 4 1 DAF Saturator Preparation 3 4 2 Distribution Manifold Preparation 4 4 3 DAF Jar Test 5 4 4 Refilling the Saturator 6 4 5 Calculating Recycle Rate 6 5 Preparing the Saturator for Storage 6 6 Maintenance 7 7 Supplementary Jar Testing Parameters 7 ...

Page 3: ...contents after chemical coagulation flocculation to determine optimum operating conditions for dissolved air flotation including DAF treatability Saturator hydrostatic operating pressure Float cohesion Chemical treatment including polymer addition for float cohesion Recycle rates Subnatant turbidity Design of downstream filters 2 OPERATING CONDITIONS To ensure a prolonged operating life the Platyp...

Page 4: ...UCTION MANUAL Page 2 3 OPERATING COMPONENTS DAF Saturator main components Platypus DAF Saturator ...

Page 5: ... rates that result in the funnel accumulating water lengthens filling time Fully open the air bleed valve to quicken the filling process by releasing displaced air Always fill the saturator with clean filtered water 5 Close the water fill valve the air bleed valve manifold outlet valves remain closed 6 Connect the compressed air line to the compressed air inlet Air pressure must not exceed 700kPa ...

Page 6: ...or approximately 90 120 seconds to achieve full saturation This period may need to be extended when the Saturator is operated at lower pressures The Saturator is ready to commence a DAF jar test subject to 4 2 4 2 Saturator outlet distribution system preparation priming and air purging To minimise the volume of unsaturated water and large bubbles of air entering the jars at a DAF test start firstl...

Page 7: ...mance of the test The compressor should remain running the air compressor s air receiver volume then offsets saturator outflow volumes to maintain pressure at the saturator Fully open the quarter turn manifold outlet valves for the jars under test Larger bubbles may initially be expelled to the jars at the commencement of the transfer This is minimised by the priming procedure so minimising the sm...

Page 8: ...ion jar test performed with 2L of sample 250mL of the sample was decanted prior to the DAF jar test During the DAF jar test 180mL of air saturated water was transferred 5 PREPARING THE SATURATOR FOR STORAGE When all testing is complete the saturator should be stored empty and depressurised This is achieved by the following 1 Close the compressed air inlet valve and disconnect the compressed air li...

Page 9: ...th clean water using a syringe Ensure the foreign body has been removed prior to reassembly 7 SUPPLEMENTARY JAR TESTING PARAMETERS The operating parameters tested during a DAF Jar Tester should be recorded for future comparison and to optimise full scale plant operating conditions Below are some suggested parameters to supplement existing jar testing records Saturator pressure Volume of air satura...

Page 10: ...UCTION MANUAL Page 8 Australian Manufacture Phone 612 9894 6777 Email info platypusjartester com ...

Reviews: