background image

IMPORTANT NOTES: Read First

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

SPIRAL STEP CLIMBER

INSTALLATION INSTRUCTIONS

Rev H

7/2/2013

R3.5-1234

Page 1 of 4

NOTE: 5' deck height shown. Other 
configurations will vary slightly, but 
does not affect assembly.

FIGURE 1

Spiral Step Climber

(A) Use liquid thread lock (such as Loctite

®

) with all threaded hardware. Important: Liquid thread lock (prior to 

curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a 
lubricant during assembly.

(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be 
allowed to cure completely before using the equipment (at least 72 hours).

(C) An appropriate energy absorbing safety surface is required under and around all playground equipment. 
Loose fill protective surfacing is shown only as an example for the purpose of this assembly instruction. Other 
surfacing material may vary in thickness and/or compression depths. See free publication - The Handbook for 
Public Playground Safety, Publication #325 at www.cpsc.gov for the surfacing appropriate for the fall height of 
the equipment or consult your surfacing supply representative.

Figure 1.2

See Footing Detail

Figure 1.1

Reviews: