background image

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

STACKED LOOP CLIMBER

Rev D

12/16/2009

1224

Page 3 of 3

Maintenance Manual.

Periodically tighten all screws, bolts and nuts. A 
periodic inspection of all parts is necessary. If a part 
is broken or worn, replace immediately. For general 
maintenance please refer to our Playground 

Maintenance

Specifications

Parts List

Part #

DESCRIPTION

QTY

Varies

Stacked Loop Climber

1

9103032-TR

Bolt Button Head 3/8" x 3/4"

4

9333002

Washer Flat 3/8" x 1" O.D. x .100" thick

4

9345002

Washer Flat SAE 1/2"

4

9443022-TR

Nut Barrel 3/8" x 5/8" BH

4

 
Plumb and level entire component. Pour concrete 
into footing holes. Allow at least 72 hours to cure 
before using this equipment.  (See Note B)

Step 5

 
Place appropriate compliant protective surfacing 
under and around Stacked Loop Climber.
(See Note D)

Step 2

 
Attach Transition Wall to deck.  Place Stacked 
Loop Climber into footing holes and attach to the
Transition Wall as shown in Figure 1.1.
(See Notes A & C)

Step 3

 
Fully tighten all fasteners according to the 
"TIGHTENING TORQUE FOR HARDWARE" 
section of the Installation Manual.

Step 4

STACKED LOOP CLIMBER:
Shall be constructed of 1.660" O.D 11 gauge steel 
tubing and connecting rails with welded 1.315" O.D. 
12 gauge steel tubing loops . The Stacked Loop 
Climber has a multi-stage baked on powder coat 
finish.

HARDWARE:
Shall be stainless steel, zinc/nickel plated or 
galvanized as required to resist rust and corrosion.

3/8" x 3/4" 

Barrel Nut

1/2" SAE Washer

3/8" x 1" O.D. Washer

3/8" x 5/8" 

Button Head Bolt

TRANSITION WALL

STACKED LOOP 
CLIMBER

Figure 1.1

Reviews: