background image

IMPORTANT NOTES: Read First

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

TUBE PANEL

Rev D

10/23/2010

1613

Page 1 of 5

(A) Use liquid thread lock (such as Loctite

®

) with all threaded hardware. Important: Liquid thread lock (prior to 

curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a 
lubricant during assembly.

(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be 
allowed to cure completely before using the equipment (at least 72 hours).

(C) Refer to Installation Manual 1708 Tube Support, R5-1601 Panel Type 1 assembly instructions for R5 
installation and R3.5-1600 for R3.5 installation.

(D) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication - 
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate 
for the fall height of the equipment or consult your surfacing supply representative.

NOTE: R5 12" Tube Panel shown. 
Other configurations will vary slightly, 
and will affect assembly where 
indicated.

1708 Tube Support

R35-1600

Section R5-1601 or 

See Footing Detail

FIGURE 1

Tube Panel

See Installation Manual 

See Installation 
Manual Section 

Figure 1.1

Summary of Contents for Tube Panel 1613

Page 1: ...e completely before using the equipment at least 72 hours C Refer to Installation Manual 1708 Tube Support R5 1601 Panel Type 1 assembly instructions for R5 installation and R3 5 1600 for R3 5 installation D Use appropriate compliant protective surfacing and adjust footing depths accordingly See free publication The Handbook for Public Playground Safety Publication 325 at www CPSC gov for the surf...

Page 2: ... FILL GROUND COVER Impact attenuating resilient surfacing 9 compacted or 12 uncompressed depth Compacted depth shown See Note D Footing Detail 18 457mm 27 686mm Step 1 Refer to Footing Layout and mark footing hole locations Dig 1 Ø 12 footing hole Refer to Footing Detail for depth and details IMPORTANT For areas with soft soil conditions larger footings may be required Additionally half foot deck ...

Page 3: ...asher 3 8 x 1 O D Washer 3 8 x 2 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 Button Head Bolt FIGURE 3 TUBE STRAIGHT 24 CRAWL TUBE PANEL FIGURE 2 ROTO PANEL ROUND TUBE STRAIGHT 24 Step 2b For R3 5 instalation attach Tube Straight 24 to Crawl Tube Panel as shown in Figure 3 See Note A Step 2a Factory Assembled For R5 installation atttach Tube Straight 24 to Roto Panel Round as shown in Figure 2...

Page 4: ...re using this equipment See Note B Step 6 Place appropriate compliant protective surfacing under and around Tube Panel See Note D Step 3 Attach panel to deck and collars Place Straight Tube Support in footing hole If attaching Window and Trim do so as shown in Figure 4 If not attach Straight Tube Support to Straight Tube 24 as shown in Figure 1 1 See Notes A C IMPORTANT Use bolts shown not bolts s...

Page 5: ...t DESCRIPTION QTY DE 1524 Tube Straight 24 1 S 1600 R35T Panel Round R3 5 1 S 1708 STRT12 Straight Tube Support 1 9103062 TR Bolt Button Head 3 8 x 1 1 4 3 9103102 TR Bolt Button Head 3 8 x 2 1 4 12 9333002 Washer Flat 3 8 x 1 O D x 100 thick 24 9413162 BLK Nut Lock 3 8 w Black Cap 12 S 1613 R35 R3 5 Ground Level Tube Panel Part DESCRIPTION QTY DE 1524 Tube Straight 24 1 S 1600 R35T Panel Round R3...

Reviews: