19
Technical manual – Installation instructions and start-up X-RAY R - ver. 1.0 del 07/11/2018
For distance between anchorage points see page 20.
On completion of previous point proceed with instructions on page 23.
OPTIONAL MATERIAL
Tension wires may be installed to ensure more structural stability under extreme windy conditions.
Steel cables and connectors (optional)
>
20 Nm
20 Nm
55 mm