20
Technical manual – Installation instructions and start-up X-RAY R - ver. 1.0 del 07/11/2018
modello
1
2
3
4
5
6
7
8
9
10
X-RAY 10 R
•
•
•
•
•
•
•
•
•
•
X-RAY 11 R
•
•
•
•
•
•
•
•
•
•
X-RAY 12 R
•
•
•
•
•
•
•
•
•
•
X-RAY 13 R
•
•
•
•
•
•
•
•
•
•
X-RAY 14 R
•
•
•
•
•
•
X-RAY 15 R
•
•
•
•
•
•
X-RAY 16 R
•
•
•
•
•
X-RAY 17 R
•
•
•
•
•
X-RAY 18 R
•
•
•
•
X-RAY 19 R
•
•
•
•
X-RAY 20 R
•
•
•
•
X-RAY 21 R
•
•
•
•
SLOPING ROOF – FLAT ROOF
Each X-RAY R manifold must be installed on four fixing points and then use a fixing kit
base for each manifold.
For positioning see the figure below.
Measurements are expressed in millimeters.
MAXIMUM NUMBER OF INSTALLATION FOR STRINGS
DISTANCE BETWEEN ANCHORAGE POINTS