42
Technical manual – Installation instructions and start-up X-RAY R - ver. 1.0 del 07/11/2018
Connect the adduction pipe coming from the thermal plant on the left side of the collector battery. Connect
the return pipe (cold side) to the top fitting of the first manifold (the first from the left), plug the central fitting
and connect the delivery (hot side) to the low fitting. On the last string collector connect the 180 ° curve
between the first and the second fitting, plug the third (lower part).
Place the temperature probe in the probe holder of the first collector (the first from the left).
For larger systems with for example more than 6 X-RAY 15 collectors, they can be arranged in two rows.
Care must be taken to balance the system by making a connection between the two series.
Attention: both rows must have the same number of collectors (see diagram).
LEFT SIDE CONNECTION
LARGE SYSTEM