In the system installation and loading phase, the solar panels must be transported and handled in their original
packaging, which must not be removed until they are positioned on the roof, or any other structure on which they
are to be installed, in accordance with the paragraph “Cover the panels”.
When handling and lifting the solar panels, personal protective equipment suitable for the handling should always be
worn. The panels should be transported with the aid of ropes passed through the eyebolts provided (see the figure
below). The eyebolts must be screwed to the bolts provided on the rear part of the panel head profile.
It is obligatory to use certified karabiners (spring catches) and ropes that have a breakage point above 2000 kg.
Non sollevare il collettore utilizzando gli attacchi idraulici filettati, non sollevare il collettore gravando
o tirando sui tubi di vetro.
Evitare che il collettore subisca colpi o azioni meccaniche, proteggete soprattutto
i tubi in vetro che per la loro natura sono particolarmente fragili.
Fissare accuratamente le funi per il sollevamento: Attenzione pericolo di incidenti anche gravi!
TRANSPORT INSTRUCTIONS
Do not lift the manifolds by connecting to the threaded hydraulic connections.
Do not lift the collectors by putting on or pulling on the glass tubes.
Prevent collectors from being struck or mechanically damaged, especially protect glass pipes
which by their nature are particularly fragile.
Attach any lifting belts carefully to avoid serious accidents!