1
General
1. GENERAL
1.1. Manufacturer
1.2. Markings
1.3. Using the Manual (symbols etc)
1.4. Operator Responsibility
1.5. Health & Safety (Scooters)
2. TECHNICAL
2.1. Main Components Access™ Van
2.2. Dimensions Access™ Van
2.3. Technical Data (Volts, PLS Blue)
3. PRODUCT USE:
3.1. Intended Use
3.2. Improper Use
4. SAFETY DEVICES
4.1. Description of Safety Devices Access™ Van
5. STICKERS
5.1. Description of Labels & Stickers
6. LOGISTICS
6.1. Receipt and Inspection
6.2. Storing the Lift
6.3. Handling
7. INSTALLATION
7.1. Risk Assessment
7.2. General Installation- Box Section Chassis
7.3. General Installation- Open Section Chassis
7.4. Power Pack Mounting Options
7.5. Checking the Power Pack Oil Level
7.6. Hydraulic and Electrical Fittings
7.7. Floor Height Adjustment
7.8. Bridge Plate Adjustment
7.9. Weight Test- Dynamic
7.10. Weight Test- Overload, Drift & Static
7.11. Installation Checklist
7.12. Torque Settings
8. OPERATION
8.1. Standard Operation procedure
8.2. Manual Override
9. CLEANING
9.1. Cleaning Instructions
10. SERVICE AND MAINTENANCE
10.1. UK Service & Warranty
10.2. Loler
10.3. Daily Inspections
10.4. Monthly Inspections
10.5. Six Monthly inspections
10.6. Lubrication
10.7. 31 Point Check
11. DISPOSAL
11.1. Safe Disposal
12. TROUBLE SHOOTING
12.1. Trouble Shooting
13. DIAGRAMS
13.1. Wiring Diagram- Power Pack
13.2. Wiring Diagram- Lift
13.3. Hydraulic Diagram
14. SPARE PARTS
14.1. Contents List of Spare Parts Access™ Van
14.2. Spare parts request form Access™ Van
15. NOTES
Summary of Contents for Access ACC-1150
Page 7: ...1 1 5 Heath Safety Scooters General ...
Page 23: ...7 7 7 Floor Height Adjustment Installation 7 INSTALLATION 7 6 Floor Height Adjustment ...
Page 25: ...7 7 9 Weight Test Installation 7 INSTALLATION 7 8 Weight Test Dynamic Dynamic ...
Page 30: ...Thread Size Tightening Torque Nm Hydraulic Fitting BSP 1 8 17 0 1 4 34 0 3 8 47 0 ...
Page 31: ...8 8 1 Standard Operating Procedure Operation 8 OPERATION 8 1 Standard Operating Procedure ...
Page 32: ...8 8 2 Manual Override Procedure Operation 8 OPERATION 8 2 Manual Override Procedure ...
Page 35: ...10 10 2 Loler Service Maintenance ...
Page 44: ...13 13 1 Wiring Diagram Power Pack Diagrams 13 DIAGRAMS 13 1 Wiring Diagram Power Pack ...
Page 46: ...13 13 3 Hydraulic Diagram Diagrams 13 DIAGRAMS 13 3 Hydraulic Diagram ...
Page 82: ...15 Notes ...
Page 83: ...15 Notes ...