Checking Calibration
9
FIG. 8
WALL OR TARGET
MARK
There are several easy methods to check the calibration and accuracy of the PLS
5
and PLS
3
.
We recommend that you check this periodically.
METHOD 1
(PLS
5
only) Quick Check of Performance Accuracy. Place the PLS
5
on a stable
surface 25’-0” or more from a suitable wall or target. See Fig. 8. Point the #1 forward beam at
the wall or target and carefully mark the center of elevation. Swivel the PLS
5
90° on its center
until the #5 right beam is over the first mark. Check to see if there is any difference in elevation
from the center of #1 forward beam and the center of #5 right beam. Repeat to check #4 beam.
At 50’-0” the difference should not be greater than 1/8.” At 25’-0” the difference should not be
greater than 1/16.”
Summary of Contents for PLS5
Page 1: ...OPERATING MANUAL PACIFIC LASER SYSTEMS The Professional Standard NEW PLS5 ...
Page 21: ...MANUAL DE INSTRUCCIONES PACIFIC LASER SYSTEMS The Professional Standard NUEVO PLS5 ...
Page 39: ...Manual de instrucciones PACIFIC LASER SYSTEMS The Professional Standard NUEVO PLS5 ...
Page 57: ...Manuale d uso PACIFIC LASER SYSTEMS The Professional Standard NUOVO PLS5 ...
Page 75: ...Bedienungsanleitung PACIFIC LASER SYSTEMS The Professional Standard NEUES MODELL PLS5 ...
Page 93: ...GUIDE D UTILISATION PACIFIC LASER SYSTEMS The Professional Standard NOUVEAU PLS5 ...
Page 110: ......
Page 111: ......