PUM_VSR_100209_EN
11/20
0
7.
MOUNTING INSTRUCTION
RAIL SPLICE
100
50
50
100
1
2
1. VSR profile
2. Splicing sleeve
Put the rail parts under its intended position on trestles or similar.
Align the profiles vertically and horizontally.
Fix the splicing sleeve with a clamp, drill according to the drawing below with a 8.5 mm/0,33” drill-
bit and screw the splicing sleeve to one of the profiles.
Put on the other profile, position the splicing sleeve horizontally and vertically , drill and screw
together. Every splicing sleeve is to be bolted together with 12 pcs M8x25.
65
65
22
22
SUPPORT BRACKETS
1
2
1. VSR profile
2. Support bracket
The support brackets are to be positioned according to the
support measurement procedure. It is important that they are
mounted exactly at the support leg position.
Drill 8.5 mm/0,33” holes and bolt together every support
bracket with 2 pcs of M8x25 with nuts.
WARNING
PRODUCT MAY CONTAIN SHARP EDGES
Use care when servicing unit.
Failure to do so could result in minor personal
injury.