PUM_VSR_100209_EN
17/20
0
8.
MAINTENANCE INSTRUCTION
Routine check and maintenance shall be performed according to the following sche-
dule:
0-500
call outs/year
every 16 weeks
500-1500
call outs/year
every 12 weeks
1500-3000
call outs/year
every 8 weeks
3000+
call outs/year
every 4 weeks
1.
Clean the inside of the rubber seals
2.
Check that the rail runs smoothly in the horizontal support.
3.
Check for mechanical damages on support legs, trolleys and safety hooks.
3
2
1