MOVING TOWER

Before

 

-

T

he tower should only be moved by manual effort, and only from the base.

 

-

W

hen moving the tower, beware of live electrical apparatus, particularly overhead, plus wires or moving

 

 parts of machinery.

 

-

N

o personnel or materials should be on the tower during movement.

 

-

M

ake sure all castor wheels’ brakes are in release position.

 

-

C

aution should be exercised when wheeling a tower over rough, uneven or sloping ground, taking care

 

 to unlock and lock castors. If stabilizers are fitted, they should only be lifted sufficiently above the ground

 

 to clear ground obstructions. The height of the tower, when being moved should not exceed 2.5 times the

 

 minimum base dimensions, or 6 meters overall height.

After

 

-

R

elock castor and ensure that the tower is both vertically and horizontal aligned.

 

-

R

eposition stabilizers and ensure they have safe footing.

 

-

W

here necessary re-tie the towers to a rigid structure.

 

-

D

o not suspend mobile access towers without referring to your supplier.

 

-

A

 tower must be kept in good working order. Any parts found to be faulty or missing should be

 

 immediately replaced.

CARE & MAINTENANCE

-

E

quipment should kept clean, especially joints and moving parts.

-

A

ll working parts e.g. joints, threat should be lubricated lightly with oil.

-

D

o not let parts fall to the ground. Such abuse may reduce the structure integrity and

  load capacity of the equipment.
-

I

n the event of damage, the defective equipment must only be repaired by the qualified

 personnel approved by the manufacturer

CHECK LIST

1. Inspect components before erecting the tower.
2. Ensure that the tower is upright.
3. Ensure all castors are locked.
4. Ensure all castors are firmly sited on the ground, not in hanging position
5. Ensure base plates are firmly sited on the ground. Sole plate needed when the tower is used on soft soil.
6. Ensure the tower is levelled by adjusting the adjustable leg.
7. Ensure Stabilizer are fitted as specified in the assembly guide.
8. Ensure all the braces & platforms are properly installed.
9. Ensure the Handrails are fitted in place.
10. Ensure Toe boards are correctly fitted as specified in the assembly guide.
11. Ensure the Easy Access handrails are properly installed.*
12. Ensure the Couplers are locked firmly at the correct location.*
13. Ensure the Ballast is correctly in place.*

a

a

a

a

WALL

WALL

To position the tower in free 
standing. Adjust the stabilizer 
to form a square shape.

To position the tower against a 
wall. Do not remove the 
stabilizer, move parallel with 
the wall.

To position the tower in a 
corner. Remove the inside 
stabilizer and place the 
outside two parallel with the 
wall.

STABILIZER BAR

Remarks: “*” - Applicable when item is used in the tower.

3

ASSEMBLY PROCESS

LOCK

UNLOCK

UNLOCK

LOCK

Summary of Contents for Quick Access

Page 1: ...harness when the maximum drop or free fall heights is 1 8m from ground to the working level The usage of safety harness with double lanyard is strongly recommended Always make sure the safety harness...

Page 2: ...nsult your supplier It is not permissible to attach and use hoisting arrangement on towers unless specification provided by design Lifting Equipment Tower component should be firmly secured by reliabl...

Page 3: ...not let parts fall to the ground Such abuse may reduce the structure integrity and load capacity of the equipment In the event of damage the defective equipment must only be repaired by the qualified...

Page 4: ...SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW 104kg 112kg 119kg 115kg 132kg 140kg 119kg 126kg 134kg 127kg 134kg 143kg 140kg 147kg 158kg 4 RUNG LADDER DW DOUBLE WIDTH LADDER SIDE SW SINGLE WIDTH L...

Page 5: ...ustable leg until there is no inclination from vertical Step 4 Place 4 rung frames secure them with frame clips Fit diagonal braces as illustrated Step 5 Locate stabilizers to each corners as shown an...

Page 6: ...he frame resting on the first horizontal tube Ensure the brace trigger is facing to the outside of the tower Step 3 Fit the normal side frame to the brace hook resting on the opposite horizontal rung...