10. Lastly, run the Warm-Up cycle, this will prepare the spindle to cut. If the machine has been
off for more than 12 hours but less than 1 week it will run a 10 minute warm-up cycles. If the
machine has been off for more than 1 week it will run a 50 minute warm-up cycle. Before
running the cycle be sure that the tool is installed and secure (it is not good to run the machine
without a tool installed in the spindle) and that the air is on. Do not interrupt the warm-up cycle
and note that the warm-up cycle will stop automatically.
Measuring Tool Offset
(telling the machine where the end of the tool is)
https://www.youtube.com/watch?v=vq8tZN9lZa4
1:55 to 2:50
1) Make sure the machine has been homed (Home All).
2) Navigate to the “Tooling” page of the user interface which can be found in the upper left
between Production and Conf.
14