Instruction manual
KLD17-5/7-A
13/21
successively by approx. 2 m at each pillar and ought to be continued up to the maximum height except the extreme
pillars, at which a space of approximately 20 cm before the maximum height must be left.
Do not lift the steel ropes of
the pillars without the net
–
it may not be possible to lower them without the appropriate load.
Next we put the net edge under the bottom net tension cable (item 9), strain the net and fix its edge to the meshes
with supplied net hooks (item 10).
Now attach vertical steel rope (which is woven into the net mesh edge) to the upper loop of the extreme anchor.
Then we lift the net at the extreme pillars (item 3) all the way to the maximum height using the crank (item 7). Now
the side edges (with the steel vertical rope) of the hoisted net have to be hooked up on the side arms (item 11,
mounted earlier, see Chapter V).
Auxiliary ropes which are attached to the net edge
will help you to hook the net without a ladder
Properly hooked net on the side arms
is extremely important
for correct impact absorption and pillars’ life.