WARNING: failure to follow the sequence of these assembly operations could result in serious
accident or damages to the cage construction.
Next rear pillars (item 1) and central pillars (item 2) should be installed one by one according to the sequence shown
below:
Stage one - position the pillar in the anchor hinges.
Stage two - slide hinge axle (item 6) into the anchor hinges.
Stage three - lift the pillar to vertical position.
Stage four - while one man is supporting the pillar in upright
position, the other person is screwing it to the anchor in the
following sequence:
a) screw down two screws (M 20 x 50) opposite the anchor
hinges,
b) then screw down two remaining screws (M 20 x 50) next to
the anchor hinges,
c) remove hinge axle (item 6).
Before you install extreme pillars (item 3), two side arms (item 11) must be installed on each extreme pillar, one side
arm at the height of ~2,5 m and the other one at the height of ~5,5 m (the heights are marked on each extreme pillar
with blue label bands) see the drawing below. Side arms (item 11) and the extreme pillar arm are to be lined up, and
pillar item 1 and 2
anchor
item 4
hinges
anchor
item 4
pillar item 1 and 2
hinge axle item 6
hinge axle item 6