Instruction manual
S14-250 ver. 2020
10/15
3.3. Installing indicator boards
When the base board (item 2) with the white take-
off board (item 3) are properly mounted in the tray
(item 1) the indicator boards need to be installed.
Put the plasticine indicator board (item 4) or
training indicator board (item 5) into the tray next
to the white take-off board (item 3) and the set is
ready for use.
Image 2. Set ready for use, mounted in the runway