STT11-65E
–
wireless operation
User manual
9/22
V. Assembly
WARNING: failure to follow the sequence of these assembly operations could result in serious
accident or damages to the construction.
As it is marked on the bases,
place them on the sides of the
PV box, spaced apart according
to the below drawing.
„0” –
line „0” according to the IAAF rules
L
–
left stand base
R
–
right stand base
LA
–
landing area projection
PV
–
Pole Vault box [mm]
Screw the crossbar supports to
lying posts (left and right) using
screws screwed into guides on
posts.
crossbar support
mounting holes
in the runner