To assemble the landing area please follow the below steps:
place the pole vault box surrounding pads (01 and 02) around the
pole vault box, so as the distance between the rear edge of the box
and the landing area pads (a) is 15 cm, make sure that all the
Velcro® pads adjoin properly, next attach wedge panels 03 and 04,
front panels 11 and 12, then side panels 13 and 14;
now the main segments 05, 06 and 07 should linked to the rest of
the segments using the jacquard webbing belts and self-locking
buckles located on the segment sides, do the same with the
segments 08, 09 and 10;
then place parts 01, 02, 11, 12, 13, 14 on the other side in the same
way as in the first step;
last step is to place the top pad 23 on the landing area and fasten it
to the segments using the snap hooks and D-rings, now the landing
area is ready for use.