EVCO S.p.A.
Vcolor 869
| Installer manual ver. 1.0 | Code 144VC869E104
page 68 of 92
PAR.
DEFAULT
MIN.
MAX.
U.M.
MAIN REGULATOR
r0
2
1
15
°C/°F
(1)
Cabinet set point differential in blast chilling, blast-freezing,
sanitation, ice cream hardening and customized cycles.
r1
90
1
500
min
Duration of time controlled blast chilling
r2
240
1
500
min
Duration of time controlled blast-freezing
r3
3
-50
99
°C/°F
(1)
Product temperature to end temperature controlled blast chilling
and to end the soft phase in temperature controlled soft blast-
freezing.See also parameter r5
r4
-18
-50
99
°C/°F
(1)
Product temperature to end temperature controlled blast-
freezing. See also parameter r6.
r5
90
1
500
min
Maximum permitted duration for temperature controlled blast
chilling. See also parameter r3
r6
240
1
500
min
Maximum permitted duration for temperature controlled blast-
freezing. See also parameter r4
r7
0
-50
99
°C/°F
(1)
Cabinet temperature set point during blast chilling and the soft
phase of soft blast-freezing. See also parameter r0
r8
-40
-50
99
°C/°F
(1)
Cabinet temperature set point during blast-freezing and ice
cream hardening. See also parameter r0.
r9
-20
-50
99
°C/°F
(1)
Cabinet temperature set point during the hard phase of hard
blast chilling. See also parameter r0.
r10
2
-50
99
°C/°F
(1)
Cabinet temperature set point during conservation after blast
chilling, hard blast chilling and continuous cycle. See also
parameter r0
r11
-20
-50
99
°C/°F
(1)
Cabinet temperature set point during conservation after blast-
freezing and soft blast-freezing. See also parameter r0
r12
5
-50
99
°C/°F
(1)
Cabinet temperature set point during pre-cooling. See also
parameter r0
r13
15
-50
99
°C/°F
(1)
Product temperature to end the hard phase of hard temperature
controlled blast chilling.
r14
60
10
100
%
Duration of the hard phase of hard time controlled blast chilling
(i.e. the percentage of the value set by parameter r1). Duration
of the soft phase of time controlled soft blast-freezing (i.e. the
percentage of the value set by parameter r2)
r15
65
-50
199
°C/°F
(1)
Product temperature below which the count for maximum
duration begins for temperature controlled blast chilling or
blast-freezing.
r17
5
0
99
°C/°F
(1)
Minimum gap between the product and cabinet temperatures,
according to which the first phase of the test for correct
insertion of the needle probe is considered successfully
completed
0 = the test is disabled and the needle probe is considered
always inserted
r18
80
10
999
s
Duration of the second phase of the test for correct insertion of
the needle probe.
r19
-40
-50
+99
°C/°F
(1)
Cabinet temperature set point for the first phase of sanitation.