10. CVT TRANSMISSION SYSTEM
10–4
(
Picture 3-1-1-2
)
皮皮皮皮
:
3.1.2
皮皮皮皮皮皮皮,皮皮皮皮皮皮皮。皮皮皮皮皮皮皮皮皮皮,都都都都都都皮皮都都都。因
此皮皮皮皮皮,必必必必皮皮皮必都必必必:其其必其必
~
。如如
10
15mm
3-1-
:
2
:
Belt Assembly
After the belt assembly is finished, the belt tension should be appropriate.
Too loose or too tight will obvious effect the operating life of belt. So the verticality of loose
edge should be checked after the belt assembly is finished, the drooping height is
10~~15mm, refer to picture 3-1-2
(
Picture 3-1-2
)
Adjust gasket
Check this position
Summary of Contents for 1100 GKE OutLaw
Page 1: ...Service Manual 1100GKE 4 4...
Page 62: ...4 COOLING SYSTEM 4 6 Cooling System Chart...
Page 158: ...10 CVT TRANSMISSION SYSTEM 10 7 5 Appearance installation dimension map Fan shaped array 10...
Page 165: ...11 EFI SYSTEM OF SQR 472ENGINE 11 3 3 The ECU control principle diagram...
Page 166: ...11 EFI SYSTEM OF SQR 472ENGINE 11 4 4 The ECU function module layout...
Page 260: ......