2. Vehicle body
,
Muffler
2-7
Meter assy
Remove
Remove one bolt 1
Remove two bolts 2
Loosen the two clasp of deposit bag.
Remove all the connector of meter.
Remove meter cover assy.
Remove three nuts (6), remove meter.
Installation
Reverse the removal procedure for
Installation.
1.
COVER,METER
2.
RUBBER WASHER(
φ
5×
φ
10×1)
3.
SCREW(M4.2×16)
4. SCREW(M4.2×12)
5.
WASHER(
φ
5×
φ
15×1)
6.
LOCKNUT,FLANGE(M5)
7.
COVER,METER
8.
CIGARETTE LIGHT
9.
WARNING SWTICH
10.
IGNITION SWITCH
11.
METER
2
Summary of Contents for 1100 GKE OutLaw
Page 1: ...Service Manual 1100GKE 4 4...
Page 62: ...4 COOLING SYSTEM 4 6 Cooling System Chart...
Page 158: ...10 CVT TRANSMISSION SYSTEM 10 7 5 Appearance installation dimension map Fan shaped array 10...
Page 165: ...11 EFI SYSTEM OF SQR 472ENGINE 11 3 3 The ECU control principle diagram...
Page 166: ...11 EFI SYSTEM OF SQR 472ENGINE 11 4 4 The ECU function module layout...
Page 260: ......