Chery QQ Service Manual
Mechanical Part of SQR 472Engine
6-8
2. Disassembly
2.1 Remove the water pump pulley as the view showing.
It will be better of disassembling with special tool.
Torque: 25
±
1.5 N.m
2.2
Disassembly of Timing Belt Cover
Torque: 6
±
1N.m
2.3
Disassembly of torsional damper
Use special tools to prevent the gear ring from
rotating. When disassembling the fixing bolts of the
torsional damper, make sure that the marks on the
crankshaft timing pulley match with the timing marks
on the engine oil pump.
2.4 Remove the timing belt back plate.
Summary of Contents for 1100 GKE OutLaw
Page 1: ...Service Manual 1100GKE 4 4...
Page 62: ...4 COOLING SYSTEM 4 6 Cooling System Chart...
Page 158: ...10 CVT TRANSMISSION SYSTEM 10 7 5 Appearance installation dimension map Fan shaped array 10...
Page 165: ...11 EFI SYSTEM OF SQR 472ENGINE 11 3 3 The ECU control principle diagram...
Page 166: ...11 EFI SYSTEM OF SQR 472ENGINE 11 4 4 The ECU function module layout...
Page 260: ......