UK
Installation
Note: If the appliance has not been stored or moved in an upright position, let it stand upright for
approximately 12 hours before operation. If in doubt allow the appliance to stand.
1.
Remove the appliance from the packaging. Make sure that all protective plastic film and coatings are
thoroughly removed from all surfaces
2.
Maintain a distance of 20cm (7 inches)
between the unit and walls or other objects for ventilation.
Increase the distance of the object is a heat source. Do not block front ventilation grills.
Note: Before using the appliance for the first time, clean the shelves and interior with soapy water.
Operation
It is important that food entering the Blast Chiller/Freezer does not exceed a temperature of 90C
It is recommended that metal containers / trays are used as other materials such as plastic or polystyrene
containers will act as an insulator and extend blast chilling times
Sufficient space must be left between products in order to guarantee a sufficient flow of cold air. Ensure product
is not in contact with the internal walls of the unit, and leave sufficient gaps between trays.
Never obstruct the inlet of the evaporator fans.
Products that are more difficult to chill because of their composition and size should be placed in the centre of
the unit.
Blast chilling data refers to standard products (low fat content) with a thickness below 50 mm: therefore avoid
overlaying products on trays or the insertion of pieces with a much higher thickness, as this will lead to an
extension of blast chilling times. Always distribute the product well on the trays and in the case of thick pieces
decrease the amount to blast chill.
Limit the number of times and the duration of time the doors are opened.
The chiller should be used for storage for short periods only.
When removing product that has undergone blast chilling / shock freezing, always wear gloves to protect the
hands from
cold burns.
Introduction
The device has the following operational states:
• "on" (the device is switched on and an operating cycle is running)
• "stand-by" (the device is switched on but no operating cycle is running)
• "off" (the device is not switched on).
If power is interrupted during a timed blast chilling operation, when power is restored, chilling will continue
from the time point at which the interruption occurred (with a maximum error of 10 minutes).
If power is interrupted during a set-temperature blast chilling operation, when power is restored, chilling will
start again from the beginning.
If power is interrupted during a storage operation, when power is restored the storage operation will be reset.
If power is interrupted while in "stand-by" mode, when power is re- stored the device will be in the same state.
Summary of Contents for CK640
Page 104: ...CK640_ML_v1 ...