CLUTCH
6.22
6.
Install sheave onto puller.
7.
Install nut onto puller rod and tighten by hand.
Turn puller barrel for further tension if needed.
8.
Turn
clutch
sheave
counterclockwise
until
bushing is removed. Repeat Steps 5 - 8 for other
bushing.
9.
Remove nut from puller rod and set aside.
10. Remove adapters from puller.
11. Remove bushing and removal tool from adapters.
Discard bushing.
DRIVEN CLUTCH MOVEABLE
SHEAVE - BUSHING
INSTALLATION
Number Two Puller
Adapter (#10)
Piston Pin Puller
(PN 2870386)
1.
Working from the top, insert Number Two Puller
Adapter (#10) (PN 5020633) onto the puller. See
illustration at above.
2.
Start new bushing evenly in moveable sheave.
Apply Loctite
t
680 (PN 2870584) to the back
side of new bushing.
3.
Install sheave onto puller with new bushing
upward as shown. Install the Number Two Puller
Adapter (#10) (PN 5020633).
PartShark.com
877-999-5686
Summary of Contents for 2009 Trail Blazer 330
Page 94: ...ENGINE 3 48 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 110: ...FUEL SYSTEM CARBURETION 4 16 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 124: ...BODY STEERING SUSPENSION 5 14 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 196: ...ELECTRICAL 10 4 REVERSE LIMIT SYSTEM P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 226: ...ELECTRICAL 10 34 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 227: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BOSS P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 228: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BOSS P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 229: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BLAZER P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 230: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BLAZER P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...