3.59
ENGINE / COOLING
3
9924125 - 2013
RANGER
RZR / RZR S / RZR 4 Service Manual
© Copyright 2012 Polaris Sales Inc.
2.
Install cylinder head on cylinder.
3.
Lubricate threads, top of washers and underside of
bolt head with engine oil. Install head bolts (C) and
torque ication in sequence.
4.
Lubricate push rods (D) and install into lifters.
5.
Lubricate rockers (E) with engine oil.
6.
Verify pushrods are engaged in lifters.
7.
Install rockers. Be sure that tab of fulcrum (F) is seated
in head stand-off. Torque bolts to specification.
=
T
Head Bolts:
1) Torque to 15
1.5 ft-lbs in sequence
2) Back off all head bolts 5 turns in sequence
3) Torque to 35
4 ft-lbs in sequence
4) Tighten all head bolts in sequence another 90
or (1/4 turn)
C
=
T
Rocker Arm Bolt:
22
2 ft-lbs (30
3 Nm)
D
E
F
PRELIMINARY
VERSION
Summary of Contents for 2013 RANGER RZR
Page 417: ...2013 RANGER RZR 800...
Page 418: ...2013 RANGER RZR 800...
Page 419: ...2013 RANGER RZR 800 EPS...
Page 420: ...2013 RANGER RZR 800 EPS...
Page 421: ...2013 RANGER RZR S 800...
Page 422: ...2013 RANGER RZR S 800...
Page 423: ...2013 RANGER RZR S 800 INT L...
Page 424: ...2013 RANGER RZR S 800 INT L...
Page 425: ...2013 RANGER RZR 4 800...
Page 426: ...2013 RANGER RZR 4 800...
Page 427: ...2013 RANGER RZR 4 800 EPS...
Page 428: ...2013 RANGER RZR 4 800 EPS...